The existing decking was carefully removed from the balconies before the new aluminium decking system was installed. Each stage required accurate planning, safe access and close attention to detail to ensure the replacement works were completed efficiently and to the required standard. The new decking provides a durable, fire-rated and low-maintenance solution, helping to improve safety and compliance across the building.

Working within a residential setting required careful management to reduce disruption and maintain safe access throughout the programme. Alloy Fabweld’s experience in live-environment remediation allowed the team to coordinate works effectively, protect the surrounding building fabric and maintain a consistent standard across each balcony.

The successful completion of Stadium Place demonstrates Alloy Fabweld’s ability to deliver compliant balcony decking replacement works with precision, control and professionalism. The project reflects their wider expertise in remediation, combining technical knowledge, safe delivery and practical solutions for occupied residential buildings.

"Alloy Fabweld delivered the Stadium Place balcony decking replacement with professionalism and technical confidence. Their team managed the removal and replacement works safely and efficiently, providing a compliant, durable solution that improved the long-term performance of the balconies."

Project Manager

Balconies

Stadium Place, Walthamstow is a residential development where balcony safety, compliance and long-term durability were central to the remediation works. Alloy Fabweld was appointed to deliver a balcony decking replacement package, removing existing non-compliant decking and replacing it with a compliant A2 fire-rated aluminium decking system.

The project was delivered over a five-month programme with a contract value of £590k. Alloy Fabweld provided a complete remediation service, managing the works from inspection through to completion. This direct-delivery approach gave the client a clear and reliable route through the project, with Alloy Fabweld taking ownership of the programme, coordination and quality of the finished works.