top of page

GROUP PRODUCT SOLUTIONS 

WELDER 2_edited.jpg

OUR COMBINED GROUP EXPERTISE OFFERS THE CONSTRUCTION INDUSTRY WITH THE BEST CARBON-NEUTRAL SOLUTIONS. 

​

PROVIDING MODULAR INNOVATION, FROM THE UK'S ONLY OFF-GRID PRODUCTION FACILITIES, POWERED BY 52 ACRE SOLAR FARM AND ANAEROBIC DIGESTER.

 

BALCONIES, STAIR CORES, FORMWORK BATHROOM MODULES THROUGH TO CAR PARK SOLUTIONS. OUR PRODUCTS PROVIDE THE CONSTRUCTION INDUSTRY WITH THE BEST SOLUTION FOR A CARBON-NEUTRAL AND MODULAR WORLD.

Solar farm Hunwick image.jpg

THE UK'S FIRST CARBON-NEUTRAL OFF-GRID PRODUCTION FACILITY

Anaerobic Digester Alloy Fabweld .jpg

SAVING 165,000 TONNES OF CARBON OVER THE NEXT 25 YEARS 

AlloyFabweld Logo Black rgb transparent (for Jordan)_edited_edited_edited.png
Flexi_Logos_FLEXI GROUP.jpg
Albion Design Logo 2022.png
cps logo.png
TRIPLE SSS BALCONY
SSS Balcony Logo BLK.png

​

TWO INDUSTRY LEADERS JOIN FORCES TO PROVIDE A MARKET-LEADING BALCONY SOLUTION THAT SOLVES KEY INDUSTRY ISSUES.
 

THROUGH THE COMBINED INDUSTRY KNOWLEDGE WITH OUR PARTNERSHIP IN BALCONIES ALIDECK WHO ARE EXPERTS IN NON-COMBUSTIBLE, QUICK-FIT AND EASY INSTALLATION SYSTEMS, ALONG WITH OUR SPECIALIST DESIGN, ENGINEERING AND INSTALLATION WITHIN ALLOY FABWELD LTD.

​

EXCEEDS THE LATEST BUILDING REQUIREMENTS, ALL FULLY UNDERPINNED BY OUR TRIPLE SSS GUARANTEE.

​

READ OUR KEY BENEFITS FOR DEVELOPERS, ARCHITECTS, AND BUILDERS FROM MANUFACTURE TO INSTALLATION >>

TRIPLE SSS BALCONY

​

SAFE | SIMPLE | SUSTAINABLE

 

TRIPLE SSS GUARANTEE 

​

EXCEEDS ALL BRITISH QUALITY AND FIRE STANDARDS

Flexi_Logos_FLEXI STAIR.jpg

FLEXI STAIR 

​

LEADING OFF -SITE FORMWORK STAIR CORE

15% PROCESS REDUCTION

REDUCED CO2  & MANUFACTURING COST

Flexi_Logos_FLEXI STAIR.jpg

OFF-SITE FORMWORK SYSTEM FOR STAIR CORES

​

  • ZERO ON-SITE WELDING AVOIDING CLOSURE OF CORE

  • BALUSTRADE: INSTANT SAFE WORKING EDGE 

  • REDUCED DELIVERIES TO SITE

  • PROGRAM LEAD TIME

  • 5 X LIGHTER THAN PRECAST

  • LESS CONCRETE PER FLIGHT

FLEXI STAIR WINS1.png
FLEXI EDGE LOGO.png

INNOVATIVE BALCONY SYSTEM FOR CONCRETE FRAMES​

​

  • OFF-SITE EFFICIENCY - SAVE TIME & MONEY ON-SITE

  • ADDED VALUE SAVINGS – CIRCA £1,800 PER BALCONY

  • IMPROVED HEALTH & SAFETY -SIGNIFICANTLY REDUCED WORK AT HEIGHT

  • PRE-INSTALLED BALUSTRADE ANCHORS – IMPROVED SPEED OF BALUSTRADE INSTALLATION

FLEXI EDGE WINS2.png
FLEXI EDGE LOGO.png

FLEXI EDGE 

​

INNOVATIVE BALCONY SYSTEM FOR CONCRETE FRAMES

NO SHUTTERING AT FORMWORK STAGE

FLEXI STAIR
FLEX EDGE