Alloy Fabweld was very honoured to be involved in contributing to this high profile project and prestigious venue, the home of “The
Derby Festival” which includes the world’s most famous flat horse race, The Derby
The works was to provide an extensive architectural and structural metalwork package in and around the new 11,000 capacity grandstand.
The design was very specific with very clear instruction in the aesthetics of the overall completed package. A high and demanding brief
called for a high degree of precision and skill to achieve the desired requirements in design criteria and functionality.
Our Team is very dedicated and succeeded in successfully delivering a product that fulfilled everything that was asked for, aesthetically
and structurally, and most importantly on time. The project was proportioned into two phases both of which were driven by critical milestones
namely, The 2008 and 2009 Derby’s.

|